beca’s reputation by providing high standards in building services systems design and quality of design delivery. although he has a particular interest in plumbing and water services, his skills in related mechanical systems and a holistic understanding of how building projects are delivered, is a highly sought after in the china buildings market.
derek 在中国领导贝科建筑团队已有很多年,他通过提供高标准的建筑服务专业设计和完成高质量的设计项目,帮助贝科建立起良好的声誉。derek 不仅具备给排水专业精湛的技术水平,同时在其他相关建筑机电领域的专知识以及秉承完整的建筑设计、施工直至交付的管理理念,这使贝科在中国建筑市场备受青睐。
citizenship |
citizenship |
新加坡 |
awards |
winner of beca innovate 2008 awards |
2008 贝科创新奖 |
special competence |
construction and contract management of multi-disciplinary civil engineering projects. investigation and design of water supply schemes project management of design teams for civil engineering projects. investigation and design of wastewater disposal schemes large commercial and institutional building project set up large commercial and institutional building project set up |
多学科工程项目施工及合同管理 给排水系统研究及设计 工程项目设计团队的项目管理 废水系统研究及设计 大型商业及办公项目建立 合同采购及设计管理 |
background |
nov 2008 – present: beca engineering consulting (shanghai) co ltd, general manager/directo |
2008 年至今:
|
|
nov 2004 – nov 2008: beca engineering consulting (shanghai)co ltd, director |
|
|
jun 2003 – nov 2004: beca carter hollings & ferner (sea) pteltd, directo |
|
|
aug 1999 – may 2003: beca carter hollings & ferner (sea) pteltd, associate director |
|
|
jan 1995 – jul 1999: beca carter hollings & ferner (sea) pte ltd, manager (m&e) associate |
|
|
jul 1993 – dec 1994: beca carter hollings & ferner (sea) pte ltd, senior engineer |
|
|
1987 – jun 1993: beca carter hollings & ferner (sea) pte ltd, engineer |
|
relevant experience
key project responsibilities n particular responsibilities include client briefing, project management and review of design and specification for commercial division of beca buildings. n project setup, procurement and design management involved in the following projects either as a job director role or job manager role. duties in these roles covered dealing with clients on their requirements, coordinating with other consultants, leading and aligning a team of beca/becs engineers to achieve clients’ requirements:
|
|
主要项目职责 特殊职责包括向业主汇报,项目管理及审核贝科商业分区的设计及技术规范 项目建立,合同采购及设计管理 有关作为项目董事或项目经理角色参与的项目,工作包括按照客户要求处理问题,与其他顾问合作,领导和指引贝科工程团队达到客户的要求。 |
beca engineering consulting(shanghai) co ltd, nov 2004 - present |
|
贝科工程咨询(上海)有限公司 |
china experiences |
|
中国经验 |
type of projects-住宅 |
|
项目类型-住宅 |
feng qiao villas, beijing |
|
北京枫桥别墅 |
188 nos villas ranging from 400sqm to 700sqm per villa. 52 units are 4 levels and 136 units are 3 levels (all units are built with its own basement). there is also an approximate 8000sqm of clubhouse. the clubhouse consists of 4 levels inclusive a basement. facilities like swimming pool, gymnasium, tennis courts, and activities room are all within the clubhouse. |
|
188栋别墅,每栋别墅从400平方米至700平方米,52个单元是四层,136个单元是三层(所有单元都有自己的地下室)。还有约8000平方米的会所,会所由四层地下室组成,包括游泳池、健身房,网球场及活动房。 |
mixed development |
|
综合项目 |
closed to 600,000sqm mixed developments in changfeng putou, shanghai for guocoland |
|
上海浦陀长风生态商务区600,000平方米综合开发项目 |
600,000 sqm dongzhimen mixed development in beijing for guocoland(the donghua mixed development is situated at dong zhimen and comprises of 5 main zones, namely the hotel, office twin towers, service condos with a clubhouse located in-between, retails (north zone and south zone), and lastly the airport terminal hall and the bus interchange. the entire development shares 2 levels of basement carparks and m&e plant room space.) |
|
600,000平方米东直门东华广场暨交通枢纽工程(位于东直门,包含5个区块,分别为1座5星级酒店;双塔写字楼及其底层商业;2座服务式公寓及会所,以及其底层商业;南区及北区商业;机场航站楼位于整个项目西南侧以及与其贯通的公交站场。所有的区块共用两层的地下部分,其中包含车库及机电用房等设施。) |
xi’an capitaretail mixed development (230,000sqm) |
|
西安凯德综合发展项目(230,000平方米) |
beijing cito |
|
北京明日之城 |
2 separate functional zones. phase 1 is for the residential zone and gfa is 84,350 sqm. it’ includes 2 hotel apartment blocks, 7 apartment towers, 4 storey soho and 3 storey basement car park, phase 2 is for the commercial zone and gfa is 108,700 sqm. it includes 4-storey lease mall podium, 4 office towers, 1 hotel tower and 2 storey basement car park. |
|
两个独立的功能区,第一阶段是住宅区,总建筑面积约84,350 平方米,包括2个酒店式公寓区域,7栋公寓,4层soho及3层地下停车场, 第二阶段是商业区,总建筑面积约108,700平方米,包括4层出租商业裙房,4栋办公楼,1栋酒店及2层地下停车场 |
ruqi building chongqing |
|
重庆瑞奇大厦 |
the project consists of a 24-storey residential tower on a 9-storey podium and 5-level basement, with a total gross floor area of approx 86,000m2 and a site area of approx 5,702m2. |
|
该项目由9层裙房及裙房之上24层住宅和5层地下室组成,总建筑面积约为86,000平方米,占地面积约5,702平方米。 |
ascendas science & technology park, dalian, phase i & iii |
|
大连腾飞科技园,一期及三期 |
retails |
|
商场 |
qingdao olympic project (shopping mall) |
|
青岛奥运村项目(大型购物中心) |
beijing tian tong yuan shopping mall for capitaretail |
|
凯德北京天通苑商场 |
the total gfa of the project is approximately 72,620 sq m comprising of two level of basement of approximately 33,489 sqm and four storeys above ground of approximately 39,131 sqm. |
|
总建筑面积约为72,620平方米,包括二层地下室的建筑面积约为33,489平方米和地上四层商业区的建筑面积约为39,131平方米 |
capitalretail mall zhengzhou |
|
郑州凯德商场 |
office |
|
办公楼 |
90,00sqm software park in dalian for ascendas phase 1 |
|
90,000sqm 大连软件园第一期 |
106,000 sq m 34 storey grade a green office building for capitaland china group in beijing. |
|
凯德大厦机电系统升级为国际“a”级写字楼工程(106,000 平方米,34层写字楼) |
taikang office in beijing (the total area of the office building is approximately 38,000sqm with a total of 17 floors) |
|
北京泰康人寿办公楼(该项目为地上17层,建筑面积约为38,000平方米) |
imc tower in qingdao (a 240m office tower, gfa approx 217,000sqm) |
|
青岛imc大厦 (240米高的办公楼,总建筑面积约217,000平方米) |
ascendas science and technology park in hangzhou phase 1 stage 1(approximately 100,000sq.m of gfa) |
|
杭州科技园区第一期第一阶段(第一阶段总建筑面积约100,000平米) |
hotels |
|
酒店 |
450 rooms crowne plaza hotel for join in group in suzhou |
|
苏州皇冠假日大酒店(450间客房) |
400 rooms for kempinski hotel group in dalian |
|
凯宾斯基大连酒店(400间客房) |
reviewer consultancy services role for kempinksi hotels in zhonguancun(beijing), qingdao, sanya, shanghai, taiyuan, yinchuan, tianjin, huizhou, inner mongolia, xian, guiyang, chongqing, suzhou and xiamen |
|
北京中关村、青岛,三亚,上海,太原,银川,天津,惠州,内蒙古,西安,贵阳,重庆,苏州及厦门的凯宾斯基酒店顾问服务 |
crowne plaza hotel nanchang, jiangxi for redco properties (gfa is 39,500 sq m) |
|
力高置业的江西南昌皇冠假日酒店(总建筑面积39,500 平方米) |
renovation of kempinski hotel, beijing |
|
北京凯宾斯基酒店改造 |
guangzhou yingde hotel hot springs |
|
广州英德酒店 |
intercontinental hotel in dalian (600 rooms) |
|
大连洲际酒店(600间客房) |
ningbo crowne plaza hotel |
|
宁波皇冠酒店 |
the project gross floor area is approximately 142,000sqm, comprises of a 500 room hotel and serviced apartments. |
|
该项目总占地面积约为142,000平方米,由500间客房的酒店和服务式公寓组成 |
intercontinental resort hotel in sanya (350 rooms.) |
|
三亚洲际酒店(350间客房) |
wanda hotel in sanya |
|
万达三亚酒店 |
wanda hotel in dalian |
|
万达大连酒店 |
wanda hotel in shijiazhuang |
|
万达石家庄酒店 |
wanda hotel in tangshan |
|
万达唐山酒店 |
wanda hotel in yichang |
|
万达宜昌酒店 |
wanda hotel in huhehaote |
|
万达呼和浩特酒店 |
hilton hotel in zhengzhou |
|
郑州希尔顿酒店 |
cixi crowne plaza hotel |
|
慈溪皇冠酒店 |
due diligence |
|
调研评估 |
due diligence for joffre 688 shopping center in shanghai |
|
上海淮海路688号商场评估 |
due diligence studies for a 120,000sqm office building for shui on (hongkong) in beijing |
|
香港瑞安公司在北京的120,000平方米办公楼现场调研评估 |
due diligence studies for a 5 star hotel at fortune plaza in beijing for a singapore based client |
|
北京财富中心五星级酒店现场调研评估 |
study on a smoke extract system for an existing 50 storey office building in shanghai |
|
上海50层写安楼排烟系统调研 |
technical review harbor network rd center |
|
港湾软件园中心技术审核 |
m&e review for nokia factory in dongguang |
|
东莞诺基亚工厂机电审核 |
m&e review for capitaretail mall in tianjin |
|
凯德天津湾机电审核 |
the site area is approximately 38000m2. the above ground is 4 storey retail approximately 56000m2 and basement one is carpark |
|
该项目占地面积约38000平方米,地上四层是零售商店约56000平方米,地下一层是停车场 |
zhengzhou technical review |
|
郑州建业项目技术审核 |
the site area is approximately 42,642.4m2 and comprises of zone a, b and c. the zone c the above ground is 41,876.75m2 and basement one is 13,425.54m2 |
|
该项目占地面积约42,642.4平方米包括a、b和c区,c区地上四层是41,876.75平方米,地下一层是13,425.54平方米 |
tenancies |
|
租赁 |
tenacy works in zpark for reuters |
|
路透社租赁中关村软件园办公楼项目 |
reuters tenancy at zpark, beijing (gfa : 4617.58 sq m) |
|
路透社研发中心(总建筑面积4617.58平方米) |
mercedes benz showroom, beijing |
|
北京奔驰汽车展厅 |
beca carter hollings & ferner (sea) pte ltd, 1987 – nov 2004 |
|
贝科(东南亚)私人有限公司 |
singapore/malaysia/indonesia/hongkong/taiwan/new zealand experiences |
|
新加坡/马来西亚/印尼/香港/台湾/新西兰经验 |
involved in the following projects either as a job director role or job manager role. duties in these roles covered dealing with clients on their requirements, coordinating with other consultants, leading and aligning a team of beca/becs engineers to achieve clients’ requirements: |
|
有关作为项目董事或项目经理角色参与的项目,工作包括按照客户要求处理问题,与其他顾问合作,领导和指引贝科工程团队达到客户的要求。 |
1.5 million sq ft of data centre (alexandra distripark) |
|
150万平方米数据中心 |
morgan stanley taiwan (singapore) |
|
台湾morgan stanley(新加坡) |
dbs tower 1(singapore) |
|
dbs第一栋(新加坡) |
bukit timah plaza(singapore) |
|
bukit timah大厦(新加坡) |
70 units naga court condominium(singapore) |
|
70个单元naga court公寓(新加坡) |
65 units 9 holt road condominium(singapore) |
|
9 holt 路 65个单元公寓(新加坡) |
65 units lloyd road condominium(singapore) |
|
lloyd路 65个单元公寓(新加坡) |
66 units hillview condominium(singapore) |
|
66个单元hillview公寓(新加坡) |
16 units cluny hill/park bungalows(singapore) |
|
16个单元cluny hill/park别墅(新加坡) |
mount palmer pumping station(singapore) |
|
mount palmer泵站(新加坡) |
bedok food factory(singapore) |
|
bedok 食品工厂(新加坡) |
morgan stanley asia ltd (hongkong) |
|
morgan stanley亚洲公司(香港) |
morgan stanley asia ltd technical monitoring system (hongkong) |
|
morgan stanley亚洲公司技术监控系统(香港) |
429 units waterplace condominium (singapore) |
|
429个单元waterplace公寓(新加坡) |
le meridien hotel expansion, jakarta(indonesia) |
|
雅加达le meridien 酒店扩建(印尼) |
bintan resort development(indonesia) |
|
bintan度假村(印尼) |
project management includes concept design of entire m&e systems for this 435 hectares site. the components cover this development includes the following |
|
项目管理包括这个435公顷场地整个机电系统的概念设计。组成如下: |
infrastructure - water/power/telecommunication for the entire infrastructure (7 - 8 km of road). |
|
基础构造 –整个构造的水/能源/通讯(公路7 - 8 km) |
club med hotel - 320 room hotels. (indonesia) |
|
俱乐部酒店- 320间客房(印尼) |
golf and country clubhouse - 3 storey clubhouse supporting the 27 holes golf course (indonesia) |
|
高尔夫和乡村俱乐部-支持27洞的高尔夫场地3层俱乐部(印尼) |
27 holes golf course - electrical supply to all the irrigation pump station, golf course lightings. (indonesia) |
|
27洞高尔夫场地-所有冲洗泵的电气供应,高尔夫场地照明(印尼) |
support facilities - support facilities building to support the entire development. (indonesia) |
|
备用设施-备用设施以支持整个建筑物(印尼) |
villas/apartments -242 units of villas/apartments(indonesia) |
|
别墅/公寓-242个别墅单元/公寓(印尼) |
72 units 4-storey eastwood park condominium (singapore)) |
|
72个单元4层eastwood park 公寓(新加坡) |
cikarang tech park, jakarta (indonesia) |
|
雅加达cikarang tech公园(印尼) |
retrofitting of 3m singapore |
|
新加坡3m翻新(新加坡) |
3m jalan pemimpin - tenancy works (malaysia) |
|
3m jalan pemimpin-租赁工作(印尼) |
3m seremban factory, malaysia |
|
马来西亚3m seremban 工厂 |
12-storey merchant court hotel(singapore) |
|
12层merchant 庭院酒店(新加坡) |
killiney road service apartments (singapore) |
|
killiney road 服务式公寓(新加坡) |
地址:北京市朝阳区甘露园南里20号楼-4至15层101号7层5号
电话:86-13911144282 邮编:100123